Create checklists for handoffs that include photos, measurements, and signatures. For example, before drywall, confirm wire counts, box depths, blocking locations, and insulation status. A single missed backer can trigger a cascade: open wall, reschedule inspector, slide tile start, move cabinet delivery. When expectations are explicit, crews finish completely rather than almost. Rework shrinks, tempers cool, and the schedule holds. Clear handoffs are faster, friendlier, and far cheaper than heroic catch‑up later.
Sometimes overlap is necessary, especially near deadlines. Limit concurrent crews to the space and supervision available, and define directional flow so nobody blocks exits or materials. Use colored tape on floors to assign zones and protect fresh finishes. On a hospital corridor upgrade, alternating nights for painters and ceiling installers halved duration without collisions. Stacking succeeds when logistics are preplanned, cleanup is disciplined, and everyone understands that speed comes from coordination, not simply adding more bodies.
Before rolling out a complex detail, build a small section and invite the next trade to review. A first‑run tile niche can reveal waterproofing conflicts; a duct soffit mockup can catch framing depth issues. Adjust once, then repeat perfectly. Photograph the approved result and make it the standard. This tiny investment avoids embarrassing rip‑outs that steal days and morale. Teams trust the plan when they see it work at full scale, not just on paper.
All Rights Reserved.